
Crumb Rubber Manufacturing Line comma Rubber PowEPT Creation Line 500kg solHour
one period Solitary Hook DebeaEPTLSJ-1200
Structural characteristics
The blade of cutter is produced of alloy welding and the area is tough wear-resisting period
On security aspect comma this EPT have protecting body comma which can effectively assure safety in the procedure of pulling out wire loop time period
Motor and EPT comma and as a EPT comma the framework is compact period
The EPT occupies the EPT floor comma convenient installation period
Use colon
Pulling out the wire loops from the mouth of waste tires period of time
2 time period Tire Cutter QDJ-1200
The simple basic principle is colon motor drives hydraulic system and the cylinder comma spot the tire to lock arm comma fasten two blades rotating amongst tire and shear cylinders operate to transfer comma two blades rotating blades forming shear comma accomplish the result of shear period of time
Attribute colon
This products comma good shear result comma shearing speed comma reduced strength usage comma modest quantity comma convenient comma because use the hydraulic method comma straightforward operation and secure period of time
Mechanical description colon the tires a lot more than 800 need to have to cut comma and minimize into 4 items in EPT periodthe dimensions of piece is two hundred-500mm time period
Notes for using tire cutter colon
a period of time Inspect the knives frequently comma if appear apparent blunt comma it must be preserve timely comma and the provider is two-3 many years time period
b period the oil in hydraulic station need to be filtered and modified often period EPTly filter as soon as every single a single and 50 % year interval
c interval Donning components colon rubber seals comma sent with one more established when ship the EPT to the consumer interval
3 amp4 period EPT tire shredEPTZPS-900
Use colon
This EPT can straight crush tires scaled-down than 800mm tires interval At the EPT temperature comma can be set immediately crushed into fifty ast 50 mm block comma so the subsequent rotating can grind into ten-30 meshes or wire and fiber separation equipment time period
Function colon
This EPT is a compact structure comma sophisticated engineering comma lower strength intake comma high efficiency comma smashing off the test place for the composition comma upkeep is particularly hassle-free semi tools with carbide surfacing technologies comma large hardness comma substantial wear resistance comma and recurring restore employing comma so has a EPTer support lifestyle semi rotary screen for the lattice composition of metal mesh comma blanking large area comma enabling the screening of certified rubber period of time After the partition of large tires can attain the impact of the identical excl
Mechanical description colon the tires of 800mm diameter and rubber ring can immediately be damaged into fifty ast50 mm of rubber block period of time
Notes for employing EPT tire shredder colon
a interval Inject gear oil into EPT oil lparhypoid gear oil rpar comma major bearings use calcium-based mostly grease lubrication comma three months following the procedure of the EPT comma the oil must be changed and clean the gas tank period Since then adjust the oil once time every single 12 months period
b After offer with three comma000 tons of waste rubber lparin standard conditions rpar commathe buyer need to grind the blade slicing edge after time period The blades is the put on components comma the EPT provider existence is 5-six several years comma when offering the EPT to the purchaser comma the shredEPTwill be equipped with edge hardness layer patching content lparelectrodes rpar period of time
five period of time Double Rolls Rubber Crusher XKP-560
Use colon
Largely employed for crack massive rubber blocks into 40-50mm modest rubber blocks period
Technological parameters colon
Framework colon The rollers undertake alloy chilly challenging forged irons with put on-resisting comma tough characters interval The mill flour is with tooth comma high groove time period
In orEPTto lengthen the services daily life of the cracker comma we propose create foundations for rubber cracker period of time
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and difficult equipment area EPT with lower sound and EPTer service daily life time period
5Our crackers are designed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with great operating platforms comma all the wires will be connected well from managing program to motor time period When utilizing the EPT comma the customers just need to have to hook up straight to the EPT period of time
Crumb Rubber Production Line comma Rubber PowEPT Manufacturing Line 500kg solHour
| No period of time | Name | Product | Qty period of time lparQty rpar |
Motor EPT lparKW rpar | ||
| 1 | Solitary hook debeader | LSJ-1200 | one | 11 | ||
| 2 | EPT tyre cutter | QDJ-1200 | 1 | 5 period5 | ||
| three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | 61 period5 | ||
| 5 | Double Rolls Rubber Crusher | XKP560 | 1 | 90 | ||
| six | Big conveyor tools | BCL-8 | 1 | two | ||
| 7 | Small conveyor equipment | BCL-three | 1 | 1 period1 | ||
| eight | Massive Magnet separator | BMS22 | one | 2 period2 | ||
| nine | Modest Magnet separator | SMS-1 | 1 | 1 period1 | ||
| ten | Large Shaking display | BSS-8 | 1 | 7 period5 | ||
| eleven | Modest Shaking display screen | SSS-three | one | 3 | ||
| 12 | Fiber separator | FS110 | one | 5 period5 | ||
| 13 | Good Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
| Square vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | 1 | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | one | period75 | |||
| Storage pin | 1 period5cbm | one | ||||
| Hopper | one | |||||
| Belt conveyer | one | period75 | ||||
| fourteen | Steel Baller EPT | 30T | one | 7 period5 | ||
| fifteen | Rubber powder EPT EPT | one | three | |||
| 24 | 334 period4KW | |||||

